This was the first mural we tackled in the new Lamar County High School renovations. The mural maxed out the visible space atop the walking track on the upper level of the new gym space. Two months later, we came back to paint the mural below. We were never told why.
This image was shot with paint touchups still drying - !

We recommended that the school use just the trojan graphic about 33 feet wide in this space to dominate it in the same way we picture a real Trojan doing. They rejected the idea. It reads "Welcome to Lamar County High School.
Then, two months later, for reasons unknown to us, the Trojan mural was replaced by a metal logo, replicating the new Trojan mural in the gym. 
Back to Top